Experience optimal outdoor lighting with the Ozark Trail 500 Lumen Lantern. This LED lantern offers four lighting modes: high, medium, low, and candle flicker. It provides up to 500 lumens with an 8-hour runtime on high and 42 hours on low. Powered by three AA batteries (not included), it features a convenient hook for hanging and a compact design for easy portability. The lantern is impact-resistant up to 1 meter and has an IPX4 water resistance rating, ensuring durability for outdoor use.
- High Mode: 500 lumens, 8-hour runtime, 14-meter beam distance
- Medium Mode: 120 lumens, 19-hour runtime, 7-meter beam distance
- Low Mode: 42 lumens, 42-hour runtime, 4-meter beam distance
- Candle Flicker Mode: Variable lumen output
Dimensions: 3.9″ x 6.7″ x 3.9″ (9.9 cm x 17.1 cm x 9.9 cm)
Model Number: 21220



